Testinside 1Y0-613 Exam
Citrix Access Suite 4.0: Analysis
- 科目编号:1Y0-613
- 科目名称: Citrix Access Suite 4.0: Analysis
- 考题数目:*** Q&As (help)
- 更新日期:2011-10-24
- Testing Engine (SoftWare Version): ¥ 250.00
- PDF (Printable Version) Price: ¥100.00 此价格仅供参考
TestInside 1Y0-613 模拟测试题覆盖了1Y0-613 所有的知识点, 通过参考学习我们的1Y0-613,将帮助你尽快的掌握1Y0-613产品知识
免费下载 1Y0-613 认证资料Demo
下载 1Y0-613 PDF 认证考试学习资料
下载 TestInside 测试引擎
Testinside中文站在国内没有第三方销售渠道,买前请注意产品保障-点击查看
选择 Testinside 1Y0-613 学习资料
1Y0-613 考试是 Citrix 公司的 Citrix Access Suite 4.0: Analysis 认证考试官方代号,TestInside 1Y0-613 权威考试学习资料软件是一款真正全面的1Y0-613考试模拟资料,是您获得1Y0-613知识的重要工具。1Y0-613是来自于Citrix 厂商的认证考试科目,TestInside祝您在第一次参加 1Y0-613 考试的考生即顺利通过,否则我们免费帮你更新或者免费赠送您其它资料一份。
Citrix Access Suite 4.0: Analysis 认证作为全球IT领域专家 Citrix 热门认证之一,是许多大中IT企业选择人才标准的必备条件。 如果你正在准备 1Y0-613 考试,为 Citrix Citrix Access Suite 4.0: Analysis认证做最后冲刺,又苦于没有绝对权威的考试材料学习, TestInside考题大师希望能助你成功通过1Y0-613考试。
1、Testinside考题大师1Y0-613学习材料是Testinside IT专家经过猜题和网络收集的学习材料整理汇编,覆盖了大部分考试内容,答案由多位专业资深讲师整理得出,命中率极高,只要您使用本站的考试学习资料参加1Y0-613考试,您将会轻松通过1Y0-613考试;
2、售后服务第一!我们相信要想在当今时代取得成功,必须为广大用户提供全套的周到细致的全程优质售后服务,只有客户满意了,我们才能发展。客户至上是我们Testinside考题大师的一贯宗旨;
3、Testinside实行“一次不过免费更新或者免费另赠一门“承诺。如果您购买我们1Y0-613的考题,60天内只要没有通过,凭盖有PROMETRIC或VUE考试中心钢印的考试成绩单,我们将为您提供免费更新或者免费赠送一门;
4、本站1Y0-613学习资料根据1Y0-613考试的变化动态更新,在厂家更新考试发生变化后,我们会尽快更新1Y0-613学习资料。确保1Y0-613最新1Y0-613考题大师学习材料有效。
5、软件版本1Y0-613 考试学习资料
优点:具有学习模式,测试模式,线上自动升级
缺点:仅限固定电脑使用,不可打印为文本,只能PC阅读
6、PDF 格式1Y0-613 考试学习资料
优点:不需下载安装软件,方便用户打印和携带,但也带来了可随意复制的弊端,因此我们提醒用户不得随意公开或出售本站的1Y0-613学习资料,一经发现立即取消其升级资格,且不予退款。
缺点:不具备测试模式,通过查看 Testinside.cn网站及查收我们的更新E-MAIL获取更新信息。
部分题目样本(非实时更新)
Exam : Citrix 1Y0-613
Title : Citrix Access Suite 4.0:Analysis
1. Scenario: You have been asked to assess the Presentation Server environment at a corporation. As you learn more about the corporation, you find that inconsistencies abound within the environment, and as a result has led to user frustration and dissatisfaction.
When questioning the administrator of the Presentation Server about the requirements for implementing changes, he states that he merely informs the other administrators verbally or by e-mail about major changes, such as a new application or server. Minor changes, such as configuration modifications, are commonly made as necessary.
Which two recommendations would you make regarding the change control process? (Choose two.)
A. Only two administrators should be allowed to make changes.
B. Administrators should be allowed to make changes only after informing the other administrators.
C. Administrators should be allowed to make changes only after having tested the change thoroughly.
D. Administrators should be allowed to make changes only when following a fully documented process.
Answer: CD
2. Scenario: Your consulting firm must provide an Access Strategy Assessment to a company based on one Presentation Server farm consisting of 15 servers. The company has instructed the team to review specific configurations related to printing and Terminal Services profiles to address user complaints. Finally, you are required to talk directly with several users who have been experiencing issues.
In discussing the Statement of Work with the customer, approximately how much time should be allotted for the Access Strategy Assessment?
A. 1 - 2 weeks
B. 3 - 4 weeks
C. 2 - 3 business days
D. 14 - 20 business days
Answer: A
3. Scenario: An enterprise deployed a Presentation Server farm which includes five servers. These servers were built manually using a documented process. They are planning to expand the environment by one to two servers per quarter and seek guidance from you regarding how they should facilitate the server build process.
What should you recommend?
A. They should continue to use the manual process as it is suitable for the provided projections.
B. They should create a base server build based on the operating system, Citrix Presentation Server, and all applications using a scripting or
cloning tool.
C. They should create a base server build based on the operating system using a scripting or cloning tool. Citrix Presentation Server and all applications should be deployed using Installation Manager.
D. They should create the base server build based on the operating system and Citrix Presentation Server using a scripting or cloning tool. All applications should be deployed using Installation Manager.
Answer: D
4. Scenario: Your team will provide an assessment of a client's Access Suite environment, which will then be followed by the POC (Proof of Concept) and design phases. You met with the Active Directory Administrator twice. In these meetings, you learned that there are multiple OUs (Organizational Units) related to the Citrix servers and that different GPOs (Group Policy Objects) apply to each OU. You asked for more detailed information regarding how they have applied the OU structure and GPO, but it has not yet been provided. You have raised this issue several times to the customer project manager and even the project sponsor.
This information is required for both the assessment and upcoming design. What should you do in response to this delay?
A. You should issue a risk memo to the Active Directory Administrator.
B. You should issue a risk memo to the project manager and project sponsor.
C. You should include this in the Issues section of the weekly project status report.
D. You should conclude the assessment portion of the project and indicate that the information was unavailable in all areas related to network traffic.
Answer: B
5. Scenario: After a meeting with the CIO from your client organization, you learn that they plan to expand their environmental consulting practice and double in size in the next two years. Six of their Presentation Servers are used to host a specific application that facilitates writing environmental management plans. This application is accessed by field consultants through Access Gateway Advanced Edition. Users report that they are generally satisfied with the current access strategy, although they occasionally experience connection issues to the file server that houses customer documentation.
They plan on adding two or three additional modules of the application within the next few months. The CIO has asked you to review their current environment to determine how it can be optimized in order to support their plans.
Based on the information provided, what is the primary objective of the client organization?
A. Growth
B. Security
C. User connectivity
D. Application deployment
Answer: A
TestInside 的优势
1Y0-613 试题的质量和价值
TestInside 模拟测试题具有最高的专业技术含量,只供具有相关专业知识的专家和学者学习和研究之用。
通过 1Y0-613 考试
如果你使用 TestInside 模拟测试,我们希望你的第一次参加考试即取得成功
试用后再购买
TestInside 提供每种产品免费测试。在您决定购买之前,请检测联接,可能存在的问题及试题质量和适用性。
TestInside认证考试学习资料网专业提供Citrix 1Y0-613 最新学习资料下载,覆盖 1Y0-613 考试重点。


客户反馈
好题库,向大家推荐!
吉米 - 2010-11-02 12:36:46