920-807 Exam
Nortel Unified Communications Solutions
- 科目编号:920-807
- 科目名称:Nortel Unified Communications Solutions
- 考题数目:56 Q&As
- 更新日期:2010-05-23
- 价 格 :
¥ 462.00¥ 413.00
免费下载 920-807 认证考题Demo
下载 920-807 PDF 认证考试题库
下载 TestInside 测试引擎
选择 Testinside 920-807 题库
920-807 考试是 Nortel 公司的 Nortel Unified Communications Solutions 认证考试官方代号,TestInside 920-807 权威考试题库软件是 Nortel 认证厂商的授权产品,TestInside 绝对保证第一次参加 920-807 考试的考生即可顺利通过,否则承诺全额退款!
Nortel Unified Communications Solutions 认证作为全球IT领域专家 Nortel 热门认证之一,是许多大中IT企业选择人才标准的必备条件。 如果你正在准备 920-807 考试,为 Nortel Nortel Unified Communications Solutions认证做最后冲刺,又苦于没有绝对权威的考试真题模拟, TestInside 希望能助你成
1、Testinside考题大师920-807试题都是考试原题的完美组合,覆盖率95%以上,答案由多位专业资深讲师原版破解得出,正确率100%,只要您使用本站的考试题库参加920-807 考试,我们保证您一次轻松通过考试;
2、售后服务第一!我们相信要想在当今时代取得成功,必须为广大用户提供全套的周到细致的全程优质售后服务,只有客户满意了,我们才能发展。客户至上是我们Testinside考题大师的一贯宗旨;
3、Testinside实行“一次不过全额退款”承诺。如果您购买我们920-807的考题,只要不是首次通过,凭盖有PROMETRIC或VUE考试中心钢印的考试成绩单,我们将退还您购买920-807考题大师的全部费用,绝对保证您的利益不受到任何的损失;
4、本站920-807题库根据920-807考试的变化动态更新,在厂家考题每次发生变化后,我们承诺2天内更新920-807题库。确保920-807考题的覆盖率始终都在95%以上;我们提供2种 920-807 考题大师版本供你选择。
5、软件版本920-807 考试题库
优点:具有学习模式,测试模式,线上自动升级
缺点:仅限固定电脑使用,不可打印为文本,只能PC阅读
6、PDF 格式920-807 考试题库(部分最新更新科目已不提供PDF)
优点:不需下载安装软件,方便用户打印和携带,但也带来了可随意复制的弊端,因此我们提醒用户不得随意公开或出售本站的920-807题库,一经发现立即取消其升级资格,且不予退款。
缺点:不具备测试模式,通过查看 Testinside.cn网站及查收我们的更新E-MAIL获取更新信息。
Exam : Nortel 920-807
Title : Nortel Unified Communications Solutions
1. When making a decision to deploy a multi-vendor unified communications enabled solution using SIP, what should the enterprise IT support teams do in preparation for the project?A.Fully test the solution for interoperability.
B.Ask management to consider a single vendor.
C.Look for open source tools to manage the solution.
D.Request that all vendors adhere to strict common standards.
Answer: A
2. In some cases IP gateways are required in a pure IP PBX environment.Where in the network would the IP gateway be placed, if one were required?
A.between the IP PBX and the carrier
B.between the IP call server and its associated gateways
C.between the IP PBX and any firewalls
D.an IP gateway is not required in a pure IP PBX solution
Answer: A
3. Which statement supports why a project team should conduct the requirements definition prior to the unified communications (UC) proof-of-concept project scope of work definition?
A.It helps identify a short-list of vendor UC solutions that can be incorporated into the UC project.
B.It slows down the UC proof-of-concept project from moving forward due to internal politics.
C.It provides a detailed project plan defining project milestones and timelines.
D.It identifies the scope of the UC project for labor estimating and project planning.
Answer: D
4. In the review and validation steps of a unified communications proof-of-concept scope of work document, which task should be completed first?
A.Create upper management reporting templates.
B.Measure key performance indicators (KPI) for reporting purposes.
C.Create a monthly project assessment template to collect UC project data points.
D.Calculate the financial return on investment (ROI) benchmarks.
Answer: C
5. A unified communications pilot project financial return on investment (ROI) model must have access to the organizations accurate sales, general, and administrative overhead expenses.Which decision criterion is critical for a Chief Financial Officer prior to signing-off on the preliminary financial ROI model?
A.acceptance of key performance indicators with metrics
B.determining the length of time that the UC proof-of-concept pilot project ROI must make
C.identifying and validating all associated costs and that they are correctly entered into the ROI model
D.planning on whether to use CAPEX or OPEX to pay for the UC proof-of-concept project
Answer: C
6. When determining whether to proceed with a unified communications proof-of-concept project, which steps are decision points for a Chief Financial Officer? (Choose two.)
A.creating an acceptable UC project budget
B.defining who should be on the UC project team
C.obtaining an acceptable preliminary financial ROI returnD.developing a UC project plan that spans 6 to 9 months
Answer: AC
7. A company has an existing traditional TDM PBX and wishes to implement a unified communications project. At the present time it is more feasible to add a second VoIP-enabled PBX into the existing configuration to complete the project rather than replace the existing system.To make this system work as designed, the company must purchase and configure which other piece of hardware for this solution?
A.Router
B.IP gatewayC.New telephone sets
D.This solution is not possible
Answer: B
8. A company that is implementing unified communications (UC) has a mobile workforce that utilizes mobile end point devices such as PDA devices.Which security method will be needed to secure UC dialogue between the PDA devices?
A.Authentication
B.Encryption
C.One time passwords
D.RFID tagging and tracking
Answer: B
TestInside 的优势
920-807 试题的质量和价值
TestInside 模拟测试题具有最高的专业技术含量,只供具有相关专业知识的专家和学者学习和研究之用。
100% 保证您通过 920-807 的考试
如果你使用 TestInside 模拟测试,我们将保证你的第一次参加考试即取得成功,否则,我们将全额退款!
试用后再购买
TestInside 提供每种产品免费测试。在您决定购买之前,请检测联接,可能存在的问题及试题质量和适用性。
TestInside认证考试题库网专业提供Nortel 920-807 最新题库下载,完全覆盖 920-807 考试原题。


客户反馈